Home Top Stories After Eight Months, NRC Resumes Operations At Abuja-Kaduna Railway

After Eight Months, NRC Resumes Operations At Abuja-Kaduna Railway

352
0

Abuja (Sundiata Post) – The Nigerian Railway Corporation (NRC) has resumed operations at the Kaduna-Abuja railway, eight months after they were suspended.

In March, Boko Haram attacked a passenger train along the route, leading to the suspension of service.

But on Monday, operations resumed with the first train leaving the terminal by 9:45 am. The Kaduna-Abuja bound train arrived at the Idu Train Station exactly at 10:22 am.(Channels)

Loading...
Previous articleBurna Boy’s Mother, Bose Wows His Fans With Her Fluent French (video)
Next articleJigawa: Woman, Husband Arrested For Conspiring To Bury Newborn Alive

Leave a Reply